Chassis Dyno Torque Calibration

Power Test Dyno Service Tech. demonstrates how to calibrate torque on a Power Test chassis dynamometer with the PowerNet data acquisition and control software system. Calibration of torque is recommended to be performed at a minimum of every six months. Calibration is a simple process taking only 10-15 minutes, and ensures quality, repeatable testing results from your chassis dynamometer.

This entry was posted in . Bookmark the permalink.